Work in progress in September 1973, a year after the northern abutment was emptied of rubble and strengthened with concrete. A concrete strut to keep the abutments apart was built below water level, within the safety of a coffer dam.
Skip To Content Skip To Primary Navigation Skip To Secondary Features
Work in progress in September 1973, a year after the northern abutment was emptied of rubble and strengthened with concrete. A concrete strut to keep the abutments apart was built below water level, within the safety of a coffer dam.